This project will fix a persistent flooding issue on the main lawn of Onaero Domain during rainfall.
The project includes:
Project period: mid-April to mid-June 2023
The sealed car parking area off SH3 will be set aside for bach owners’ use during the project. If vehicle access to the baches is required, please contact NPDC on 06-759 6060 or enquiries@npdc.govt.nz.
Pedestrian access to all baches will remain open throughout the work, as will vehicle access to the beach.
Was this page useful?
Page last updated: 11:07am Mon 20 March 2023